Tuesday, July 25, 2006

EUAS Afsin-Elbistan (A) Thermal Power Plant rehabilitation works tender

Electricity Generation A.Ş. (EUAS), the state owned utility company, has made an international tender invitation for Unit A thermal power plant rehabilitation project at its Afşin-Elbistan facilities in the southeastern province of Kahramanmaraş. The project is financed by a EUR 280 million loan provided from the World Bank.

The project is estimated to cost EUR 380 million. The remaining EUR 100 million fund will be provided from own resources of the company. EÜAŞ will hold the tender in two stages. In the first stage, companies will be demanded to submit their technical bids, only, in sealed envelopes. After assessment of technical bids, qualified
contenders will be invited to participate in the second stage of the tender, for pricing.

The EÜAŞ tender invitation includes outlines of thermal power units in Afşin- Elbistan and lays out the tender target as to reach design values at production capacity and operability criteria.

Project Description

The Afşin-Elbistan A Power Plant is one of Turkey's largest thermal power plants, and the largest such plant to use domestic lignite. The plant has 3 units with a capacity of 340 MW each and one unit of 355 MW, which started commercial operations between 1984 and 1987. The total installed capacity is 1.355 MW.

The plant utilizes lignite of low calorific value mined at the nearby Afşin-Elbistan Lignite Mine.

The power plant has for a long time performed below design for a variety of reasons, including general wear, changes in coal quality, design, and operations and maintenance practice. Currently only one unit is in operation.

EÜAŞ has decided that the power plant should undergo major rehabilitation work, to achieve design performance of generation capacity and availability.

Scope of works for rehabilitation:

Repair, replacement and upgrade of the following power plant systems to restore reliability, availability, power output and improve plant efficiency:

-Boiler
-Firing System
-Piping
-Balance of Plant Mechanical
-Balance of Plant Electrical
-Electrostatic Precipitator
-Control and Instrumentation
-Ash and coal handling
-Civil works
-Plant chemistry
-Environmental

Within the scopes of works are also diagnostic systems for monitoring of historical data and the analysis of operational data. Environmental monitoring for continuous monitoring and data logging equipment will be provided and implemented.

- Prequalification Criteria
- Previous work experience at thermal power plant rehabilitation projects. In a consortium, each partner should have adequate experience at its segment.
- In last 10 years, completion of at least two rehabilitation projects at minimum EUR 200 mln value, as the contractor or sub- contractor. In a consortium, sum of partners' portfolio will count.
- In last 5 years, completion of a coal firing boiler – as new erection or rehabilitation- serving a thermal power unit with minimum 300-MW output capacity. In a consortium, one partner meeting this condition is enough.
- Average annual construction turnover of the contender should be at least EUR 300 mln. In a consortium the sum of partners count, but the leading partner must provide at least 40 pct of the sum, and other partners at least 25pct of the sum.
- Short term assets of the contender should be at least EUR 40 mln. In a consortium, sum of partners count.
- Legal conflict background: The contenders will provide full information on legal conflicts or arbitration cases which took place in the last 5 years.

The tender will be carried out in line with IBRD guidelines under competitive international tendering procedures, open to all from countries listed in the guideline.

Interested companies may get more information from the EÜAŞ and examine tender documents at the address below:

EÜAŞ, Elektrik Üretim A.Ş.
Termik Santrallar ve Maden Sahaları Daire Başkanlığı
İnönü Bulvarı, No: 27, KLMN Blok, Kat: 3, Oda: 330
Bahçelievler/ANKARA
Telefon: +90 312 222 33 54
Faks: +90 312 212 53 03
e-mail: halilibrahim.ozen@euas.gov.tr
Web: www.euas.gov.tr

Contenders can obtain an English language tender documents set at a price of EUR 1000 or $1300 from the address given above.

Bid submission deadline in the tender has been set as October 10, 2006. In the second stage of bidding a YTL 5 mln or equivalent bid bond will also be submitted.

Bids will be opened at the presence of contenders on the same day.

The addresses for bid submission and bis opening are as follows:

Elektrik Üretim A.Ş., EÜAŞ
Termik Santrallar ve Maden Sahaları Daire Başkanlığı
İnönü Bulvarı, No: 27, KLMN Blok, Kat: 3, Oda: 338
Bahçelievler/ANKARA
Elektrik Üretim A.Ş., EÜAŞ
İnönü Bulvarı, No: 27, A Blok, Giriş Katı
Satın Alma ve İhale Komisyonu Odası
Bahçelievler/ANKARA